Presentation program
|
Session 1:
Benchmarking Strategy, Outsourcing or own manpower
|
June 17
9:45-10:50
Ø
L. J. Vincentsen,
F. Bormlund,
Denmark
Benchmarking for
operation and maintenance of cable supported bridges
Ø
J. M. Clune,
UK
Inspection and
Maintenance, Strategy, Outsourcing or Own Manpower
|
Session 2:
Inspection and maintenance
Health Monitoring, Bridge Management Systems and Inspection Methods |
June 17
11:20-13.00
Ø
M. Higgins.
USA
Health Monitoring Combined with Visual Inspections-
Obtaining a Comprehensive Assessment of Cables
Ø
J. Bjerrum,
A. Knudsen, Denmark
Danbro+, Internet based
management system for cable supported bridges and other major structures
Ø
K. A.
Grefstad, Norway
Norwegian Suspension
Bridges. How the Inspections are carried out and feed back from the
maintenance
|
Session 3:
Inspection and maintenance
Replacement of main deck, roadway surfacing and painting robots |
June 17
14:00-15:40
Ø
D. I. List,
UK
Rejuvenating the Tamar
Bridge
Ø
V. Wegan, M.
L. Bloomstine,Denmark
Little Belt Suspension
Bridge – Durable Long Life Roadway Surfacing
Ø
M. Sakamoto,
S. Hirota, K. Sugimoto, Japan
Development of Painting
Robots for Bridges
|
Session 4:
Structural safety
Remaining service life of wire cables |
June 17
16:10-17:15
Ø
R. Mayrbaurl,
A. J. Powell, T. Paskova, USA
Method of Predicting the
Remaining Service Life of Parallel - Wire Main Cables of Suspension
Bridges
Ø
S. Camo,
USA
Reliability of Damaged
Parallel Wire Cables
|
Session 5:
Structural monitoring
Cable supported bridges
|
June 18
9:15-10:50
Ø
E. Laursen,
Denmark
The Great Belt Bridge,
Construction monitoring
Ø
B. Svensson,
L. Emaulsson, E. Svensson, Sweden
Oeresund Bridge - Cable
system - Vibration incidents
Ø
D. A. Khazem, B.
Boal, USA
Strain Gauge Monitoring
of Suspender Cables to Isolate Stresses in the Steel Orthotropic Box
Girder of the Carquinez Bridge
|
Session 6:
Inspection and maintenance
Corrosion protection of Cable systems |
June 18
11:20-12:30
Ø
D. A. Khazem, K.
Serzan, B. Boal, USA
Zinck Pasta as a Corrosion Inhibitor for the Main Cables and its Affects
on the construction of the
Carquinez Bridge
Ø
J. V.
Thomsen, M. L. Bloomstine, Denmark
Little Belt Suspension Bridge, Corrosion protection of the Main
Cables and Maintenance of Major Components
|
Session 7:
Structural monitoring
Inspection technology, Cable systems |
June 18
13:30-15:10
Ø
K. Mahmoud,
W. J. Moreau, USA
Fracture Analysis of the
Mid-Hudson Bridge Main Cable Wire
Ø
T. H.
Service, T. McKrell, R. Mayrbaurl, R. Latanision, T. Paskova, USA
Embrittlement and
Cracking of Cold-Drawn High-Strength Bridge Cable Wire
Ø
A. Moriyama,
S. Suzuki, H. Hoaahi, Y. Yoshida, Japan
Establishment of the
Non-destructive Inspection Technique for Suspender Ropes of Suspension
Bridges
|
Session 8:
Inspection and maintenance
Cable replacement study
Access equipment for
long span bridges |
June 18
15:40-17:10
Ø
W. A. Moreau,
P. Sluszka, USA
Bear Mountain Bridge
Cable Replacement
Ø
D. Anderson,
J. Barbas, USA
The Waldo Hancock
Bridge; Inspection, Monitoring and Strengthening of the Main Cables
Ø
J. Dunlop
Gibson, A. Charge, Hong Kong
Access for Long Span Bridge Maintenance and Inspection